An hour out of Denver we started the Rocky Mountain section with a steady 2% gradient to start, increasing to 4% and through a total of 28 tunnels. David Moffatt the determined builder of the line achieved the impossible through this high terrain. The route continues to be a challenge — 47% of the revenue costs are attributed to snow clearance in the winter months!